Enter Work Center
This procedure is used to enter or change a work center, thereby processing work center information and costs.
Before you start
Before you begin to enter a work center, a department and foreman area must be entered.
Follow these steps
Follow the steps below to enter or change a work center:
-
Start 'Work Center. Open' (PDS010).
-
Create the work center by specifying a work center number.
-
Specify information regarding the work center in panels E, F, and G.
-
If you want to use M3 Scheduling Workbench (SWB), select resource type 6 on panel E.
-
On panel F, select one of the auto-reporting options to indicate whether an operation planned for the work center should be reported automatically:
0 (No)
1 (Yes, these operations are reported automatically when reporting is done on the next controlling operation)
2 (Controlling operation)
3 (Yes, auto-reporting of operation time based on production receipt)
Note: For work center-related operations with alternative 3, the need for manual reporting is eliminated. All operation times with an associated auto-reporting setting of 3 are calculated and reported automatically by the system when the manufacturing quantities are received. -
Select the work center and option 11='Rates' to start 'Costing Component. Specify W/C Rates' (PCS100). If the work center is a subcontract work center, related option 11 will start 'Costing Component. Enter Material O/H' (PCS115) instead.
-
Create costs by specifying a calculation type and calculation date.
-
Specify hourly costs. End this program using F3='End' to return to 'Work Center. Open' (PDS010).
-
Select the work center and option 12='Capacity' to start 'Work Center. Change Capacity' (PDS015). For more information, see Create Capacity Calendar.
Output
This procedure results in either creating or updating work center and related costs. Additionally, a capacity calendar is created for each work center.