Connect Shift to Work Center
This document explains how to connect a shift to a work center.
Outcome
Work centers may have various shifts connected if the Validity type is '2-Temporary'.
Before you start
The process can be started when these prerequisites are met:
- Work centers are entered in 'Work Center. Open' (PDS010).
- Shifts are entered in 'Shift. Open' (PDS030).
Follow These Steps
-
Start 'Work Center. Connect Shift' (PDS014).
-
On the B panel:
-
In the first column of the grid, right-click to open the Browse window and select a work center.
-
In the Validity type (Vtp) column, select one of these values:
- 1 - General: This refers to one single record that provides information on the capacity for a given work center/shift combination.
- 2 - Temporary: This selection allows for shift capacity adjustments to be made based on the associated date range.
-
If the Validity type is 2, enter a date in the 'From date' field.
-
-
Select the Create option.
-
On the E panel:
-
Enter a 'To date' which is only applicable if the Validity type is defined as 2-Temporary.
-
For the specified work center, enter the typical number of machines, the number of persons, and/or the utilization rate in the respective fields.
-
-
Click Next to save.