Release to Production
This document explains how you release an approved engineering order (EO) revision to production.
Outcome
- The status of the EO revision in ECS200 is raised to 21 (Definite and transferred to (MOS200)).
- The old EO in ECS200 is deactivated and the status is changed to 29.
- The status of the corresponding service definition in ECS300 is raised to 21 (Definite and transferred to (MOS300)) or 31 (Definite, mandatory service, and transferred to (MOS300)).
- New work requests are created in MOS170 according to the service definition connected to the new revision. Work requests for the old engineering order are deleted from (MOS170).
- The EO revision is copied to 'Engineering Order. Open' (MOS200).
-
The (ECCRTSRV) program updates the following tables with the service revision information:
- (MMO318) work file if maintenance limits are changed
- Services (MPDSCF)
- Service facility (MPDSRC)
- Service effectivity (MOMPGM)
- Related services (MOMPGR)
- MRS effectivity (MOMPGE)
- Maintenance limits (MOMPGL)
- Certified services (MOCESE)
- Document reference (MODORE)
- Service requirements (MOSCRQ)
- Service on materials and operations (MPDSRF)
- Product database operations (MPDOPE)
- Product database materials (MPDMAT)
- Routing operation activity description (MPDOPS)
-
Engineering order data is stored in the following tables:
- Document (MPDDOC)
- Engineering order activity list (MODACT)
- EO line (MOLINE)
- Item number change (MOCHPN)
- Engineering order program (MOOPGM)
- Work request header (MWOPLP)
- Work request operations (MMPOPE)
- Schedule master (MSCHMA).
As a result. you can plan and prepare the work requests along with all existing work requests.
Before you start
- The status of the engineering order in ECS200 must be 20 (Approved).
- The status of the corresponding service definition in ECS300 must be 20 (Definite) or 30 (Definite and mandatory).
Follow These Steps
-
Start 'Engineering Order. Open' (ECS200/B).
-
Select an appropriate sorting order to identify the correct engineering order.
The recommended alternatives are 1=EO number, 6=Responsible.
-
Select the appropriate engineering order and select option 9='Transfer to production' in ECS200/B.