Close Work Order

The purpose of the procedure is to close a work order.

Before You Start

Prerequisites Before you begin, the following prerequisites must be met:

  • All operations and material lines must be reported for the work order (status 90). This applies if parameter 18 in 'Settings - Maintenance' (CRS788) is set to 2.
  • The service(s) included in the work order must be approved (status 70).

Follow These Steps

  1. Start 'Work Order. Close' (MOS050).

    This program can be accessed directly or in one of the following ways: Start 'Work Order. Open' (MOS100), highlight the order to be closed and select option 'Close WO'; or start 'Work Schedule. Open Toolbox' (MOS195), highlight the last operation that belongs to the work order to be closed and select option 'Close WO'.

  2. Enter the warehouse and location in which the object is to be placed.

  3. If the 'Next item no.', 'Next S/N', 'Config position', Warehouse and Location fields are specified, clear them.

  4. Confirm by pressing Enter. The work order is closed and the status of the work order is updated to 90 or 94.