Load
-
From the menu, select .
- Specify this information:
- Load type
- Select if Machine Load or Man Load is
displayed.
- Load category
- Select which load type to display. Select from A, B,
or C.
- Include planned orders
- Select if the load from planned orders is
included.
- Ignore overdue load in previous week
- Select if the overdue load in the previous week is ignored.
An overdue load is loaded before the previous date, as displayed in
(CPS100). (CRS786) has the option to display overdue loads in the
closest previous week or the current week.
- Ignore overdue load in current week
- Select if an overdue load in the current week is ignored.
An overdue load is loaded before the current date, as displayed in
(CPS100). (CRS786) has the option to display overdue loads in the
closest previous week or the current week.
-
Click OK.