Load - PMS960
The autostart job 'Load' (PMS960) recalculates work-load based on signals from the autostart jobs 'Entry of MO' (PMS005), 'Reschedule MO' (PMS015), and 'Deletion of MO' (PMS035).
Programs that create records in the ASJ table
| Program | Description | 
|---|---|
| DCS0H0 | Stop operation | 
| PMS065 | Auto report MO material | 
| PMS070 | MO Operation. Report | 
| PMS905 | Calculate lead time on MO | 
| PMS945 | Auto-report quality inspection work center | 
| PMS991 | Re-create workload | 
| PPS321 | Handling subcontracting | 
Input parameters - MPM960
| Field name | Description | Size | 
|---|---|---|
| ZACONO | Company | 3,0 | 
| ZATTYP | Stock transaction type | 2,0 | 
| ZAFACI | Facility | 3 | 
| ZAPRNO | Product number | 15 | 
| ZAMFNO | Manufacturing order number | 7,0 | 
| ZAOPNO | Operation number | 3,0 | 
| ZAPGNM | Program name | 10 | 
| ZARGDT | Entry date | 8,0 | 
| ZARGTM | Entry time | 6,0 | 
| ZACHID | Changed by | 10 | 
| ZATSTM | Timestamp | 26 | 
Updated tables
| Table | Description | 
|---|---|
| MPM960RR | Change workload | 
Related ASJs and functions
| Name | Description | |
|---|---|---|
| ASJ: | None | |
| Functions: | PMS910 | Remove workload | 
| PMS970 | Calculate remaining time on MO operation | |
| PMS991 | Re-create workload |