WO Load - MOS960
The auto start job 'Load' (MOS960) recalculates work-load based on signals from the auto start jobs 'Entry of WO' (MOS005), 'Reschedule WO' (MOS015), and 'Deletion of WO' (MOS035). Programs that create records in the ASJ table.
Programs that create records in the ASJ table
Program | Description |
---|---|
DCS0H0 | Stop operation |
MOS065 | Auto report WO material |
MOS070 | WO Operation. Report |
MOS070MI | Maintenance time report |
MOS085 | Inspection results - print |
MOS085MI | Inspections |
MOS143 | Work order documents - print |
MOS872 | Update operations |
MOS905 | Calculate lead time on WO |
PPS322 | Handling external repair |
Input parameters - MOS960
Field name | Description | Size |
---|---|---|
ZACONO | Company | 3,0 |
ZATTYP | Stock transaction type | 2,0 |
ZAFACI | Facility | 3 |
ZAPRNO | Product number | 15 |
ZAMFNO | Manufacturing order number | 7,0 |
ZAOPNO | Operation number | 4,0 |
ZAPGNM | Program name | 10 |
ZAJNA | Job name | 10 |
ZARGDT | Entry date | 8,0 |
ZARGTM | Entry time | 6,0 |
ZACHID | Changed by | 10 |
ZATSTM | Timestamp | 26 |
Updated tables
Table | Description |
---|---|
MOS960RR | Change workload |
Related ASJs and functions
Name | Description |
---|---|
PMS910 | Remove workload |
MOS970 | Calculate remaining time on WO operation |
CPSS991 | Re-create workload |