Parameters
You can access these tabs in Parameters:
Tab | Description |
---|---|
System |
The application plans for a 10-year horizon. You can define the calendar start date and the calendar end date is calculated based on the specified start date. You must ensure that the calendar start date is in the past and the calendar end date is some years into the future. You can set the delay calculation by calendar days or alternative according to the delay calendar, which considers holidays in delay calculation. |
Default Values | In case of missing data, the default values ensure that the application can still plan. |
Error Control | |
Environment | |
Database |
Use this tab to set up the API connection to M3 BE. The application supports several different technologies depending on the M3 BE database. For AppStream, you can use the Setting up AppStream for further details. option. SeeRun to verify if the database connection is setup correctly.To analyze the API transactions in import or export, you can enable . The trace log level has an effect after the next server logon. Therefore, you must logoff from the server first. The trace log level 5 includes sent and received data, which is often sufficient, but you can also see the tooltip for more trace log level options.The APIs called and mapping from the API to SWB is defined in the SWB parameter file MI-PARAM.DAT, which you can view in . The Planning area field contains these values:
|
Bookmarks | This tab is only used for Infor Smart Office. |
ODBC database | This tab is only visible if the Environment Variables tab. | check box is enabled in the
Import | |
Export | |
Report Control | |
File Interface | This tab is only visible if the Environment Variables tab. | check box is enabled in the
Local Order Generation | This tab is only visible if the Environment Variables tab. | check box is enabled in the
Material Control | The settings in this tab controls Material Control, Safety Lead Time, and Coverage Days Calculation. |
Scoreboard | This tab is only used to calculate scoreboard records in the active group to improve performance. You have an option to use large font in the scoreboard. |
User Interface | This tab includes the language selection and tool-tip options. |
Automatic Simulation | The boundary capacity definitions ensures that you can plan operations inside the application for a 10-year planning horizon. You can still plan the operation even if the resource has little capacity or the operation has too much operation time. |
Decisions | |
Environment variables |
You can enable these functionalities on this tab:
The Additional environment variables enables you to have additional conditions in the parameter file. For example, if you must use certain parameter file modifications in one facility, but not in others, each user or facility can enable the modification. |