Decisions
Decisions settings is used to control the way decisions are applied in the application.
- Select Settings > Decisions.
-
To enable decisions in the application, select the applicable
decision types:
- Manufacturing decisions
- Forecast decisions
- Purchase decisions
Note: Enabling decision requires that user is linked to IPW roles, IPWPLANNER or IPWADMIN, in MNS410. Alternatively, a PIN code is required when enabling decisions if IPW roles are not used. -
Specify this information:
- Manufacturing decisions
- Select the check box to take decision on manufacturing orders. Requires user to have role as IPW Planner or user to have specified a Decision PIN Code under Tools.
- Base manufacturing decision on production start
- Supply decisions are taken in the production start column. Aging and other lead time elements can create offset from production start to supply time.
-
Note: It is a prerequisite that Include production start is selected in Data retrieval 2.
- Purchase decisions
- Select the check box to take decision on purchase orders. Requires user to have role as IPW Planner or user to have specified a Decision PIN Code under Tools.
- Forecast decisions
- Select the check box to take decision on forecast. Requires user to have role as IPW Planner or user to have specified a Decision PIN Code under Tools.
- Supply rounding
- Select a rounding option from the list.
- MO end bucket
- Select a value from the list. This setting is used to specify the length of the horizon that is going to be created in the application.
- Pl ord creation meth
- Select Greedy or Evenly. This setting is used to control the way order proposals are created.
- Ignore min/max order quantity
- Update planned MO with option to ignore Order qty less than minimum qty or greater than max quantity.
- Ignore order multiple
- Update planned MO with option to ignore Order qty not dividable by order multiple.
- Set schedule number
- Select the check box to automatically set the schedule number when releasing orders. Select one, two, or three date elements from the three drop-down boxes.
- Schedule number based on
- Select to base schedule number on either Finish date or Production start date.
-
Note: If Production start is selected, then it is a prerequisite that Include production start is selected in Data retrieval 2.
- Action after commit
- Update grid after decision committed to M3. Select an option from the list.
- Click OK.