Update Trace Line Partially panel
If certain data in M3 Graphical Lot Tracker is missing or not fully synchronized with M3, the Update Trace Line Partially panel can be used to re-run a data transfer for a specific data subset, from a specific point in time.
When entering a M3 Graphical Lot Tracker database is updated. If no is entered, the corresponding M3 Graphical Lot Tracker tables are cleared and then re-initialized from the source system.
, the selected subset data from the specified date and onwards is transferred from the source system and theNote: An update trace line is run simultaneously.
To manually perform a limited subset data transfer:
- Select .
- Select a Data subset.
- Optionally, select .
- Click button.
- To monitor progress, switch to the System Log panel and click the button.