Library
  1. Initial load process

Initial load process

For the initial load of the M3 Graphical Lot Tracker database, complete these tasks:

  1. Define the settings for M3 Graphical Lot Tracker. See Defining the settings in M3 Graphical Lot Tracker.
  2. Load the M3 Graphical Lot Tracker database. See Starting the initial database load.
  3. Define user group settings in M3 Graphical Lot Tracker. See User group settings in M3 Graphical Lot Tracker.