Schedule Daily Processing panel
From this panel, you can schedule transfers of the AllData data set from the source system to M3 Graphical Lot Tracker. These data sets are included:
- Master Data
- Order Data
- Transaction Data
The default value is ‘Not enabled’.
To ensure that the AllData set is up to date for the trace line, enable the job schedule immediately after the result of the initial load is verified. Use the Schedule Daily Processing panel.