Home
  1. Administration guide
  2. Initial load process

Initial load process

For the initial load of the M3 Graphical Lot Tracker database, complete these tasks:

  1. Define the settings for M3 Graphical Lot Tracker. See Defining the settings in M3 Graphical Lot Tracker.
  2. Load the M3 Graphical Lot Tracker database. See Starting the initial database load.
  3. Define user group settings in M3 Graphical Lot Tracker. See User group settings in M3 Graphical Lot Tracker.
  • Administration guide
    • About this guide
    • About M3 Graphical Lot Tracker
    • Security
    • Initial load process
      • Defining the settings in M3 Graphical Lot Tracker
      • Starting the initial database load
      • User group settings in M3 Graphical Lot Tracker
    • System Administration panel
    • Search panels
    • Reports
    • Interface between M3 Business Engine and M3 Graphical Lot Tracker
    • Infor Ming.leĀ® Context Applications
    • Maintenance and troubleshooting
    • Settings in the Application Settings panel