Project Executive Summary
Use this widget to summarize a project recorded in (POS100) using Infor GenAI. An executive summary usually includes the overview of the project, status, performance, budget analysis, suggestions for known issues, and a conclusion. However, the content still requires verification to ensure the accuracy of AI-generated responses. For example, the sections for suggestion and conclusion are results based on the data gathered from the project activities.
The summary is also saved in M3 as a text block and as a document in Infor Document Management (IDM).
Another functionality of the widget includes copy text to clipboard, wherein you can copy the summary content and paste it on a separate notepad or Word file to check the content in another format.
Prerequisites
Before using this widget, consider this information:
- You must enable the GenAI Embedded Experience for M3 before you can use this widget. The feature must be toggled on the CloudSuite Self-ServicePortal (CSSP).
See the M3 Integrations Library (Cloud) and select .
- When you use this widget on a workspace, you must also open another widget to send the required entity type and retrieve appropriate data. For example, you might use the M3 Search and List widget to get and display information on project data.
- You must open or start a project before you use this in M3.
See the M3 Business Engine User Documentation Library (Cloud) and select .
- You must configure IDM to enable adding and saving of documents both in IDM and M3.
See the information on in-context applications in the Infor OS User and Administration Documentation Library (Cloud).
- You must create a mapping of the document ID using XQuery to display only the applicable information in the widget and related information context application.
See the information on business context mode in the Infor OS User and Administration Documentation Library (Cloud).
- You must add InforProject as an entity type for the IDM Business Context Model. Ensure that UNION /Project_Executive_Summary[@Project_Number = "{id1}"] is included in the XQuery field with consideration that the Project number is set as id1 in the InforProject entity.
Limitations
Responses generated by AI may not always be accurate or reliable. You must verify the information generated by AI and use it responsibly.
| Technology used | Average tokens per usage |
|---|---|
|
M3 Business Engine Widget SDK OS Portal, ION API Gateway, and Security GenAI IDM |
3600 |
Supported languages
The widget interface, labels, and configuration options are displayed in the user's preferred language. If the preferred language is not supported, the widget is displayed in English (en-US).
This widget supports these languages:
- Arabic (Saudi Arabia) - ar-SA
- Bulgarian (Bulgaria) - bg-BG
- Chinese (Simplified, China) - zh-CN
- Chinese (Traditional, Taiwan) - zh-TW
- Croatian (Croatia) - hr-HR
- Czech (Czech Republic) - cs-CZ
- Danish (Denmark) - da-DK
- Dutch (Netherlands) - nl-NL
- English (United States) - en-US
- Estonian (Estonia) - et-EE
- Finnish (Finland) - fi-FI
- French (France) - fr-FR
- German (Germany) - de-DE
- Hebrew (Israel) - he-IL
- Hungarian (Hungary) - hu-HU
- Italian (Italy) - it-IT
- Japanese (Japan) - ja-JP
- Korean (South Korea) - ko-KR
- Latvian (Latvia) - lv-LV
- Lithuanian (Lithuania) - lt-LT
- Norwegian Bokmål (Norway) - nb-NO
- Polish (Poland) - pl-PL
- Portuguese (Portugal) - pt-PT
- Romanian (Romania) - ro-RO
- Russian (Russia) - ru-RU
- Slovenian (Slovenia) - sl-SI
- Spanish (Spain) - es-ES
- Swedish (Sweden) - sv-SE
- Thai (Thailand) - th-TH
- Turkish (Turkey) - tr-TR
- Ukrainian (Ukraine) - uk-UA
- Vietnamese (Vietnam) - vi-VN
Supported context message
This widget receives this published inforBusinessContext message: InforProject - PROJ.
Prerequisites for integrating IDM to the Project Executive Summary widget
Before using this widget, you must ensure that these tasks are completed:
-
Import the IDMConfiguration_ProjectExecutiveSummary.xml file in IDM.
See Creating the Project Executive Summary XML file in this document and the Infor OS User and Administration Library and select .
-
Enable the Project_Executive_Summary document type filter for the GENAI-User IFS security role.
See the information on enabling a document type filter in the Infor OS User and Administration Library and select .
-
Add and configure the Project Executive Summary template file in IDM.
See Adding the Project Executive Summary template file to IDM in this document.
Creating the Project Executive Summary XML file
- Open a text editor.
- Copy and paste this XML content into the text editor:
<ProjectExecuteSummary xmlns="http://demo-showroom.infor-demo.com/schema"> <Text>{text}</Text> </ProjectExecuteSummary>
- Save the file, then specify IDMConfiguration_ProjectExecutiveSummary.xml as its file name.
Creating the Project Executive Summary template file
- Open Microsoft Word.
- Select a blank document.
- Specify <Text> in the document. Optionally, you can add a header image in the template.
- Save the Word document, then specify ProjectExecutiveSummary_Dynamic_Template.docx in its file name.
Adding the Project Executive Summary template file to IDM
- Add a new document, then select Project Executive Summary in the Document Type field.
See the information on adding a document in the Infor OS User and Administration Library and select .
- Upload the ProjectExecutiveSummary_Dynamic_Template.docx Word file into the new document.
See Creating the Project Executive Summary template file in this document.
- On the Properties tab, select Enable template, and specify this information:
- Template Name
- Specify Project_Executive_Summary_Template.
- Template Details
- Specify Project_Executive_Summary.
See the information on creating a template in the Infor OS User and Administration Library and select .
- On the Attributes tab, specify 0 in the Project Number field.
- Click .
Widget management
| Tasks | Description |
|---|---|
| Configuring the widget | Use the topic to prepare the widget for usage. Know what settings to configure to control until when a generated summary remains valid before it is considered outdated. |
| Generating a project summary | Use the topic to create an initial executive summary for a selected project when no summary exists. |
| Verifying a project's budget analysis | Use the topic to validate budget-related details in the summary. |
| Refreshing a project summary | Use the topic to ensure that the content reflects the latest project summary. |
Configuring the widget
The cache setting is used to determine if the summary is expired. Expired indicates that the generated summary date is older than the date computed based on the configuration settings. For example, if the configuration is set for one week, a generated summary that is more than one week old is considered expired.
- Click the menu icon on the widget title bar and select .
- Specify this information:
- Title
- Click the unlock button and specify a widget title.
- Summary expiration value (if selected below)
- Specify a quantity that matches with the expiration unit of the issue. For example, specify 3.
- Summary cache expiration unit
- Select an expiration unit to match with the expiration value. If you specify 3 in the summary expiration value and select days in the expiration unit, compute 3 days from the current date to know the validity of the summary.
- Click .
Generating a project summary
Generating an executive summary is most significant for this widget to fulfill its main purpose. This procedure is applicable when you have an empty summary on the widget.
- In M3, click a project from 'Project. Open' (POS100).
If used in a workspace, click a project from the M3 Search and List widget.
- On the widget, click where <project number> is a unique ID for the project provided manually by the project manager or a series patterned after the project order type. The summary request might take a while to load the content.
- Optionally, modify the summary from the widget body.
- Click .
Apart from what is saved on the widget, the summary is also saved to the project’s text block in M3 and on Infor Document Management (IDM).Note: When you use the Related Information widget alongside the Project Executive Summary widget, you can check that it generates a document that contains the similar summary saved on IDM.
Verifying a project's budget analysis
Use this procedure to verify if the declared budget and expenses for every activity are accurate on the summary. This helps the project manager check which activities have enough budget or excessive expenditures.
- Right-click an existing project from 'Project. Open' (POS100/B) with status 20 or higher and select .
- In 'Project Budget. Open' (POS110/B1), right-click a budget and select .
- Compare the summary side-by-side with the declared budget for its project activities. You may modify the generated text as necessary.
Refreshing a project summary
- Right-click an existing project from ‘Project. Open’ (POS100) and select . The related option opens the list of available activities for the project.
If used in a workspace, click a project from the M3 Search and List widget.
- Select the project or any activity from the list. After you select from the list, you can view the summary from the in-context widget.
- On the Project Executive Summary widget, click where <project number> is a unique ID for the project provided manually by the project manager or a series patterned after the project order type.
See the M3 Business Engine User Documentation Library (Cloud) and select .