Known limitations
Report-level drilling depends on the date format configured in the M3 Calendar. If a Birst report uses a date format that differs from the one configured in the M3 Calendar, update the drill-down expression to match the M3 date format. This alignment ensures that date values are interpreted correctly and that report-level drilling works as expected.
See KB3705636.