Drill back to M3 report
This drill back to M3 report is available for the Production domain:
Overall Equipment Effectiveness Details
Description: This report shows a detailed analysis of a work center's overall equipment effectiveness together with its different components: availability, performance, and quality. Other measures are also made available to support analysis of work center's OEE. The report is sorted ascendingly to highlight work center with low overall equipment effectiveness ratio. The measures used in this report are sourced from MO Operation Transactions and Overall Equipment Effectiveness facts.
Measure: Overall Equipment Effectiveness Ratio, Availability Ratio, Performance Ratio, Quality Ratio, Mach Run Non-Disturb Hrs, Mach Run Disturb Hrs, Plnd Production Hrs, Rptd Good Qty, Rptd Bad Qty, Potential Qty
Aggregation: Sum
Analyze by: Actual Finish Date, Op Actual Finish Date
Chart type: Table
Column selector: Work Center, Department, Planning Area
Drill back to M3: Hyperlink PRNO to CAS310