Custom Time
In addition to the standard Time hierarchy that comes with Birst, M3 Analytics provides a custom time hierarchy based on different periods set up in M3. This allows for the analysis of data on alternative timetables such as looking at sales figures against a company's fiscal calendar.
The M3 Custom Time hierarchy provides a consolidated dimension containing attributes for fiscal, manufacturing, and equipment periods, used in standard M3 Analytics content, as well as period types 1–5, 9, Sales, and HRM. The custom time dimension is derived from period information of each day as defined in CSYPER. You can configure the period type representing each period using these variables:
Period type | Variable | Default value |
---|---|---|
Fiscal Period | M3A_PeriodTypeFiscal | 1 |
Manufacturing Period | M3A_PeriodTypeManufacturing | 1 |
Equipment Period | M3A_PeriodTypeEquipment | 1 |
For more information on using the different period set up in M3, see KB2165396. See the information about period type variables in Infor M3 Analytics for M3 Industry CloudSuites Administration Guide.
- Week Start Date - determines the start date of the week (Monday)
- Week End Date - determines the end date based from the Week Start Date
- Week Number - determines the current week number from the start of the year
Attributes for Period Types 1–5, 9, Sales, and HRM are available in the default subject area. This table shows the attributes that are part of the custom subject area.
Hierarchy | Custom subject area | Attributes |
---|---|---|
M3A Custom Time |
M3A Equipment M3A Finance M3A Procurement M3A Production M3A Rental M3A Sales M3A Warehouse M3A Opportunity Management |
Equipment Period, Equipment Period Last Year, Equipment Period Sequence No. Equipment Year Fiscal Period, Fiscal Period Last Year, Fiscal Period Sequence No. Fiscal Year Last Equipment Period, Last Equipment Year Last Fiscal Period, Last Fiscal Year Last Manufacturing Period, Last Manufacturing Year Manufacturing Period, Manufacturing Period Last Year, Manufacturing Period Sequence No. Manufacturing Year Week Number, Week Start Date, Week End Date |
Drill map
This table shows the drill map for Custom Time:
Name | Drill From Column | Drill To Column |
---|---|---|
M3A Fiscal Calendar | Fiscal Year | Fiscal Period |
Fiscal Period | Date | |
M3A Manufacturing Calendar | Manufacturing Year | Manufacturing Period |
Manufacturing Period | Date | |
M3A Equipment Calendar | Equipment Year | Equipment Period |
Equipment Period | Date |