Overall Equipment Effectiveness sourced measures and KPIs

The table shows the Overall Equipment Effectiveness measures that are sourced directly in Data Warehouse. These measures are also derived from the MO Operation Transactions and MO Operations facts.

You can use different time series to analyze these measures. For the list of available time series measures, see Time.

Aggregations available are Avg, Max, Min, and Sum.

Measure Description
Plnd Production Hrs Sum of planned machine setup time and run time
Run Hrs The machine run hours for the operation without disturbance
Potential Qty The maximum possible manufactured quantity based on the machine run hours without disturbance in basic unit of measure
Potential Qty Alt Unit The maximum possible manufactured quantity based on the machine run hours without disturbance in alternate unit of measure
Total Mfd Qty The sum of the manufactured and scrapped quantities of the operation in basic unit of measure
Total Mfd Qty Alt Unit
Total Good Qty The manufactured quantity minus the rework quantity for the operation in basic unit of measureThe sum of the manufactured and scrapped quantities of the operation in alternate unit of measure
Total Good Qty Alt Unit The manufactured quantity minus the rework quantity for the operation in alternate unit of measure