Overall Equipment Effectiveness sourced measures and KPIs
The table shows the Overall Equipment Effectiveness measures that are sourced directly in Data Warehouse. These measures are also derived from the MO Operation Transactions and MO Operations facts.
These measures can be analyzed by different time series. For the list of available time series measures, see Time.
Aggregations available are Avg, Max, Min, and Sum.
Measure | Description |
---|---|
Plnd Production Hrs | Sum of planned machine setup time and run time |
Run Hrs | The machine run hours for the operation without disturbance |
Potential Qty | The maximum possible manufactured quantity based on the machine run hours without disturbance in basic unit of measure |
Potential Qty Alt Unit | The maximum possible manufactured quantity based on the machine run hours without disturbance in alternate unit of measure |
Total Mfd Qty | The sum of the manufactured and scrapped quantities of the operation in basic unit of measure |
Total Mfd Qty Alt Unit | The sum of the manufactured and scrapped quantities of the operation in alternate unit of measure |
Total Good Qty | The manufactured quantity minus the rework quantity for the operation in basic unit of measure |
Total Good Qty Alt Unit | The manufactured quantity minus the rework quantity for the operation in alternate unit of measure |