Equipment Reliability sourced measures and KPIs
This table shows the Equipment Reliability measures that are sourced directly in Data Warehouse.
These measures can be analyzed by different time series. These time series are available:
- Month Ago
- Quarter Ago
- Quarter-To-date
- Trailing 12 Months
- Trailing 3 Months
- Year Ago
- Year-To-date
Most measures have Avg, Max, Min, and Sum aggregations. For cases where this does not apply, the available aggregations are indicated in this table:
Measure | Description |
---|---|
Actual Usage – Hrs | The actual usage in hours of an equipment for the report date |
Actual Usage – Meter 1 | The actual usage in meter 1 of an equipment for the report date |
Actual Usage – Meter 2 | The actual usage in meter 2 of an equipment for the report date |
Actual Usage – Meter 3 | The actual usage in meter 3 of an equipment for the report date |
Actual Usage – Meter 4 | The actual usage in meter 4 of an equipment for the report date |
Downtime | The downtime hours of each work order |
Lifecycle Usage – Hrs | The average daily usage in hours of an equipment between its manufacturing date and the report date |
Lifecycle Usage – Meter 1 | The average daily usage in meter 1 of an equipment between its manufacturing date and the report date |
Lifecycle Usage – Meter 2 | The average daily usage in meter 2 of an equipment between its manufacturing date and the report date |
Lifecycle Usage – Meter 3 | The average daily usage in meter 3 of an equipment between its manufacturing date and the report date |
Lifecycle Usage – Meter 4 | The average daily usage in meter 4 of an equipment between its manufacturing date and the report date |
No. of Failures |
The number of work orders with downtime hours greater than zero Aggregations: Avg, Sum |
No. of Non-PM Work Orders |
The number of non-preventive maintenance work orders, which are defined as those with service classification not equal to 3 Aggregations: Avg, Sum |
No. of Operations | The number of operations of a completed work order |
No. of PM Work Orders |
The number of preventive maintenance work orders, which are defined as those with service classification equal to 3 Aggregations: Avg, Sum |
No. of Shutdowns | The number of work orders that required a shutdown of the equipment |
No. of WO w/ Plnd Downtime |
The number of work orders with service classification equal to 3 and downtime hours greater than 0 Aggregations: Avg, Sum |
No. of WO w/ Unplnd Downtime |
The number of work orders with service classification not equal to 3 and downtime hours greater than 0 Aggregations: Avg, Sum |
No. of Work Orders |
The number of completed work orders Aggregation: Sum |
Planned Downtime | The downtime hours of work orders with service classification equal to 3 |
Plnd Usage – Hrs | The equipment's planned usage in the meter representing hours as specified in the corresponding DWD variable |
Plnd Usage – Meter 1 | The equipment's planned usage in meter 1, as specified in the corresponding DWD variable |
Plnd Usage – Meter 2 | The equipment's planned usage in meter 2, as specified in the corresponding DWD variable |
Plnd Usage – Meter 3 | The equipment's planned usage in meter 3, as specified in the corresponding DWD variable |
Plnd Usage – Meter 4 | The equipment's planned usage in meter 4, as specified in the corresponding DWD variable |
Target Avl – Hrs | The target availability of an equipment multiplied by the planned usage in hours |
Target Avl – Meter 1 | The target availability of an equipment multiplied by the planned usage in meter 1 |
Target Avl – Meter 2 | The target availability of an equipment multiplied by the planned usage in meter 2 |
Target Avl – Meter 3 | The target availability of an equipment multiplied by the planned usage in meter 3 |
Target Avl – Meter 4 | The target availability of an equipment multiplied by the planned usage in meter 4 |
Unplanned Downtime | The downtime hours of work orders with service classification not equal to 3 |