Labor Resource Analysis sourced measures and KPIs
This table shows the Labor Resource Analysis measures that are sourced directly in Data Warehouse.
Available aggregations for the measures are Avg, Max, Min, and Sum.
Measure | Description |
---|---|
Actual Hrs – Labor | The actual labor time in hours |
Actual Hrs – Travel | The actual travel time in hours |
Actual vs Plnd Hrs Var – Labor | The actual labor hours minus the planned labor hours |
Actual vs Plnd Hrs Var – Travel | The actual travel hours minus the planned travel hours |
Capacity in Hrs | The capacity of a work center in hours for the period as specified when creating the daily capacity of the work center in PDS960 |
Disturbance Time | The actual travel and labor times that are reported with disturbances |
Maintenance Time in Hrs | The maintenance time in hours |
No. of Closed WOs | The number of closed work orders |
No. of Disturbance Rpts | The number of operation reports with disturbance time |
No. of Labor Time Rpts | The number of operation reports with labor time |
No. of Maint Reports | The number of operation reports with maintenance time |
No. of Rpts w/ Scrap | The number of operation reports with scrap quantities |
No. of Stop Reports | The number of operation reports with disturbances, such as interruptions |
No. of Travel Time Rpts | The number of operation reports with travel time |
Planned Hrs – Labor | The planned labor time in hours |
Planned Hrs – Travel | The planned travel time in hours |
Stop Time in Hrs | The total travel and labor times reported with a disturbance regarding a stop in production |
Total Actual and Stop Hrs | The sum of the actual travel time, labor time, and stop time |
Total Actual Hrs | The sum of actual travel time and labor time in hours |
Total Actual vs Plnd Hrs Var | The total actual hours minus the total planned hours |
Total Planned Hrs | The sum of planned travel time and labor run time in hours |