Calculated measures and KPIs
This table shows the measures that are calculated in the cube:
| Measure | Description | 
|---|---|
| Actual Cost per Unit | Actual cost divided by the manufactured quantity in basic unit of measure | 
| Actual vs Standard Cost % | Actual cost divided by the standard cost | 
| Actual vs Standard Cost Var | Actual cost minus the standard cost in the division currency | 
| Actual vs Standard Cost Var % | Actual versus standard cost variance divided by the standard cost | 
| Scrap vs Standard Cost % | Scrap cost divided by the standard cost | 
| Scrapped vs Mfd Qty % | Scrapped quantity divided by the manufactured quantity | 
| Standard Cost per Unit | Total actual issued quantity of all materials used in manufacturing the product | 
| Total Actual vs Standard Qty % | Total actual quantity divided by the total standard quantity |