Sourced measures and KPIs
This table shows the measures that are sourced directly in Data Warehouse:
| Measure | Description |
|---|---|
| Adjusted Capacity | Planned work center capacity excluding maintenance time and disturbance time |
| Disturbance Time in Hrs | Total production and setup hours that is reported with disturbances |
| Labor Capacity in Hrs | Total labor capacity in hours for the period as specified when creating the daily capacity of the work center |
| Mach Capacity in Hrs | Total machine capacity in hours for the period as specified when creating the daily capacity of the work center |
| Maintenance Time in Hrs | Total maintenance hours of the work center for the period |
| Manufactured Qty | Total manufactured quantity for the period in basic unit of measure |
| Mfd vs Order Qty Var | The difference between manufactured quantity and ordered quantity |
| No. of Finished MOs | Number of finished manufacturing orders for the period |
| No. of Maintenance Reports | Number of operation reports with maintenance time |
| No. of Stop Reports | Number of operation reports with disturbances such as interruptions |
| Order Qty | Total order quantity for the period when the statistics were created in basic unit of measure |
| Stop Time in Hrs | Total production and setup hours reported with a disturbance regarding a stop in production |
| Total Capacity in Hrs | Capacity in hours of the work center for the period |
| Total Hours | Sum of actual setup time and run time of the work center relative to capacity type |
| Total Labor Hrs | Sum of actual labor setup time, run time, and stop time for the period |
| Total Labor Run Hrs | Total labor run time used for the period in hours |
| Total Labor Setup Hrs | Total labor setup time used for the period in hours |
| Total Mach Run Hrs | Total machine run time used for the period in hours |
| Total Mach Setup Hrs | Total machine setup time used for the period in hours |
| Total Machine Hrs | Sum of actual machine setup time, run time, and stop time for the period |
| Total Planned Hrs | Sum of planned setup time and run time of the work center relative to capacity type |
| Total Planned Labor Hrs | Sum of planned labor setup time and run time for the period |
| Total Planned Labor Run Hrs | Total planned labor run time for the period in hours |
| Total Planned Labor Setup Hrs | Total planned labor setup time for the period in hours |
| Total Planned Mach Hrs | Sum of planned machine setup time and run time for the period |
| Total Planned Mach Run Hrs | Total planned machine run time for the period in hours |
| Total Planned Mach Setup Hrs | Total planned machine setup time for the period in hours |
| Total Run Hrs | Total actual run time of the work center relative to capacity type |
| Total Setup Hrs | Total actual setup time of the work center relative to capacity type |