Sourced measures and KPIs

This table shows the measures that are sourced directly in Data Warehouse:

Measure Description
Actual Usage – Hrs The actual usage in hours of an equipment for the report date
Actual Usage – Meter 1 The actual usage in meter 1 of an equipment for the report date
Actual Usage – Meter 2 The actual usage in meter 2 of an equipment for the report date
Actual Usage – Meter 3 The actual usage in meter 3 of an equipment for the report date
Actual Usage – Meter 4 The actual usage in meter 4 of an equipment for the report date
Downtime The downtime hours of each work order
Lifecycle Usage – Hrs The average daily usage in hours of an equipment between its manufacturing date and the report date
Lifecycle Usage – Meter 1 The average daily usage in meter 1 of an equipment between its manufacturing date and the report date
Lifecycle Usage – Meter 2 The average daily usage in meter 2 of an equipment between its manufacturing date and the report date
Lifecycle Usage – Meter 3 The average daily usage in meter 3 of an equipment between its manufacturing date and the report date
Lifecycle Usage – Meter 4 The average daily usage in meter 4 of an equipment between its manufacturing date and the report date
No. of Failures The number of work orders with downtime hours greater than zero
No. of Non-PM Work Orders The number of non-preventive maintenance work orders, which are defined as those with service classification not equal to 3
No. of Operations The number of operations of a completed work order
No. of PM Work Orders The number of preventive maintenance work orders, which are defined as those with service classification equal to 3
No. of Shutdowns The number of work orders that required a shutdown of the equipment
No. of WO w/ Plnd Downtime The number of work orders with service classification equal to 3 and downtime hours greater than 0
No. of WO w/ Unplnd Downtime The number of work orders with service classification not equal to 3 and downtime hours greater than 0
No. of Work Orders The number of completed work orders
Planned Downtime The downtime hours of work orders with service classification equal to 3
Plnd Usage – Hrs The equipment's planned usage in the meter representing hours as specified in the corresponding DWD variable
Plnd Usage – Meter 1 The equipment's planned usage in meter 1, as specified in the corresponding DWD variable
Plnd Usage – Meter 2 The equipment's planned usage in meter 2, as specified in the corresponding DWD variable
Plnd Usage – Meter 3 The equipment's planned usage in meter 3, as specified in the corresponding DWD variable
Plnd Usage – Meter 4 The equipment's planned usage in meter 4, as specified in the corresponding DWD variable
Target Avl – Hrs The target availability of an equipment multiplied by the planned usage in hours
Target Avl – Meter 1 The target availability of an equipment multiplied by the planned usage in meter 1
Target Avl – Meter 2 The target availability of an equipment multiplied by the planned usage in meter 2
Target Avl – Meter 3 The target availability of an equipment multiplied by the planned usage in meter 3
Target Avl – Meter 4 The target availability of an equipment multiplied by the planned usage in meter 4
Unplanned Downtime The downtime hours of work orders with service classification not equal to 3