DO proposal release validation for soft allocated item

You can no longer release a DO proposal using a dispatch policy with 'Auto Level' (TRLV) = 4, and 'Soft allocation transfer level' (SOFL) = 0-'No', when an item is set to 'Allocation method' (ALMT) = 6-'Soft Auto 1' or 7-'Soft Auto 2' at sending warehouse. This validation is applied in 'Planned Distribution Order. Open' (DPS170), DPS170MI.CrtPlannedDO, and batch job DPS914.

2241559