Secondary operation with same start and end as primary operation

'Start from end of primary setup time' has been added as a new Automatic Simulation parameter on Advanced > Parallel Operations. When the parameter is enabled, the secondary operation with a code 11 type, will have the same start and end date or time as the primary operation, except for the setup time.

2234957