Phase 2 development for PMS236PF re-factored report layout using configurable view

A solution has been introduced to disable the configuration in CMS program and instead, the user needs to do the setup in PMS program and this is reflected in CMS program by carrying over the data that has been configured on 'View - W/C Schedule. Open' (PMS231/E). On 'Work Center Schedule. Print' (PMS235/G), you can now carry over the view from 'Work Center Schedule. Open' (PMS230) so that the user no longer has to select it manually.

  1. If sorting order is set to 2 or 3, 'Schedule number' and 'Schedule sequence' are not automatically included in the configurable output structure. Only the fields included on (PMS231/E) are outputted.
  2. In configurable output, the length of the field cannot be overridden.
  3. As of the moment, the deviating number of decimal places cannot be overridden in configurable output.
  4. In configurable output, the 'Edit code' cannot be overridden. Numeric and date fields are formatted in the output solution instead.
  5. No classic layout. Refer to PMS232PF instead.
  6. Import or Export for PMS236PF is not yet supported.

2235281