ProcessQualitySpecification enhanced to handle notes

The inbound ProcessQualitySpecification BOD has been enhanced to handle notes.

If the Comments (SI01-SI05) fields that were initially populated in M3 must be retained, these must be copied to the Specification note of the integrating application. The comments in M3 'Specification. Open' (QMS200) are replaced with the current value in the Note element of ProcessQualitySpecification. If the Note element is null or does not exist, the corresponding comments in M3 are cleared.

2263632