Defining a period of performance template (AC/BR/GM)

Use this procedure to define a period of performance template. You can use templates to define activity date tolerances on Activity Period of Performance (AC10.6).

  1. Access Period of Performance Template (AC10.7).
  2. Use these guidelines to specify the field values:
    POP Template

    Specify a name and a description for the template.

    Sys

    Select the system code for which you are defining periods of performance. You must set up periods of performance for each system code for which you want to allow transactions outside of the normal activity date range.

    Begin Days/ End Days

    Specify the number of days before or after the activity date range that you want to allow transactions. For example, if you enter 30 in the Begin Days field, transactions are allowed for 30 days before the activity's date range.

  3. You can assign the template to an activity or activity group on Activity Period of Performance (AC10.6).

Related reports and inquiries

To Use
List Period of Performance templates POP Template Listing (AC211)