Changing Multiple Labor Cost Transfer Templates

There are two processes that you can use to change multiple Labor Cost Transfer Templates. The Labor Distribution Mass Status Change (GM115) and the Salary Cap Mass Calculation (GM116).

Use Labor Distribution Mass Status Change (GM115) to change the status of cost transfer template lines in a batch process instead of changing distributions line-by-line on the Labor Cost Transfer Template Approval (GM13.1) or Labor Cost Transfer Approval (GM13.2).