Integration checklist
Complete | Tasks |
---|---|
Create an LSP connection point in ION | |
Create an ERP connection point in ION | |
Ensure that the prerequisites for the integration are met | |
Component Checklist was imported | |
Document Flow was configured | |
Document Directions were configured in each connection points |