Configuring the Delayed Production Operations widget

To configure the Delayed Production Operations widget:

  1. Click the ellipses icon.
  2. Select Configure. The Configure widget window is displayed.
  3. Specify this information:
    Financial Company
    The code of the financial company.
    Note: By default, the value is retrieved from User Data (ttaad2500m000) session in Infor LN. However, you can modify this value by selecting from the list of financial companies based on the Companies (ttaad1100m000) session in Infor LN.
    Logistic Company
    The code of the logistic company.
    Note: By default, the value is retrieved from User Data (ttaad2500m000) session in Infor LN. However, you can modify this value by selecting from the list of financial companies based on the Companies (ttaad1100m000) session in Infor LN.
    Site
    The code of the available Sites.
    Shop Floor Planner
    The code of the relevant production orders.
    Note: This field is blank by default.
    Routing Group
    The code of the available routing groups.
    Include for context selection
    Select this check box to apply the filters selected in the Selection widget.
    Note: This check box is displayed, only if this widget is added to the homepage along with the Selection widget.
  4. Click Apply. The widget is configured on the Production Manager page.