Project Activity

In Infor LN, Project Activity is a parent-child tree structure that can include 99 levels. In Birst, the tree structure is limited to 15 levels. It is a flattened structure and the tree can be formed using drill maps in Birst Visualizer.

This table shows the LN table from which fields are retrieved for the dimension:

Table Description
tppss200 Activities

This table shows the attribute mapping to LN table fields for the dimension:

Attribute Mapping
Active Plan Flag 1 if active plan, else 0
Activity Manager tppss200.acmn
Activity Manager Name tccom130.nama
Activity Position tppss200.actp
Activity Type tppss200.tact
Activity Type Filter tppss200.tact
Activity Type Sort tppss200.tact
Actual Activity Flag 1 if actual activity else 0
Actual Finish Date tppss200.afdt
Actual Start Date tppss200.asdt
Apply Frequency to tppss200.afrt
Apply Frequency to Filter tppss200.afrt
Apply Frequency to Sort tppss200.afrt
Asset Extension tppss200.aext
Asset Number tppss200.anbr
Billable tppss200.blbl
Billable Filter tppss200.blbl
Billable Sort tppss200.blbl
Budget Status tppss200.stat
Budget Status Filter tppss200.stat
Budget Status Sort tppss200.stat
Calendar tppss200.ccal
Capital Activity tppss200.capa
Capital Activity Filter tppss200.capa
Capital Activity Sort tppss200.capa
Company tppss200.compnr
Company Desc tcemm170.desc
Constraint Date tppss200.cnsd
Constraint Type tppss200.cnst
Constraint Type Filter tppss200.cnst
Constraint Type Sort tppss200.cnst
Cost Control tppss200.cctr
Cost Control Filter tppss200.cctr
Cost Control Sort tppss200.cctr
Critical Capacity Type tppss200.capt
Critical Capacity Type Filter tppss200.capt
Critical Capacity Type Sort tppss200.capt
Current Hierarchy Level Indicates the level no. of the activity
Customized Item tppss200.litm
Deadline Date tppss200.ddln
Duration tppss200.dura
Earliest Finish Date tppss200.efdt
Earliest Start Date tppss200.esdt
Earned Value Method tppss200.mevl
Earned Value Method Filter tppss200.mevl
Earned Value Method Sort tppss200.mevl
End Percentage tppss200.prnd
Extension tppss200.cstl
Financial Company Desc tcemm170.desc
Free Float tppss200.fref
Free Float in Hours tppss200.ffhr
Frequency tppss200.freq
Hierarchy Max Level Indicates the max no. of levels
Latest Start Date tppss200.lsdt
Level Number tppss200.levl
Linked Activity tppss200.lact
Linked Activity Desc tppss200.desc for tpss200.lact
Low Level Number tppss200.llnr
Milestone Amount tppss200.mamt
Milestone Percentage tppss200.prms
Number of Time Units tppss200.qutm
OBS Element tppss200.coel
OBS Element Desc tppdm096.dsca
On Hold Date tppss200.ohdt
Organization Breakdown Structure tppss200.pcom
Organization Breakdown Structure Desc tppdm095.dsca
Parent Activity tppss200.qans
Parent Activity Desc tppss200.desc
Percentage Completed tppss200.lvps
Physical Progress Quantity tppss200.qans
Physical Progress Registration tppss200.lvps
Physical Progress Registration Filter tppss200.lvps
Physical Progress Registration Sort tppss200.lvps
Plan tppss200.cpla
Plan Desc tppss010.desc
Production Rate tppss200.prsp
Project tppss200.cprj
Project Activity tppss200.cact
Project Activity Desc tppss200.desc
Project Activity ID Desc tppss200.cact + tppss200.desc
Project Activity Level01 tppss200.cact
Project Activity Level01 ID Desc tppss200.cact + tppss200.desc
Project Activity Level02 tppss200.cact
Project Activity Level02 ID Desc tppss200.cact + tppss200.desc
Project Activity Level03 tppss200.cact
Project Activity Level03 ID Desc tppss200.cact + tppss200.desc
Project Activity Level04 tppss200.cact
Project Activity Level04 ID Desc tppss200.cact + tppss200.desc
Project Activity Level05 tppss200.cact
Project Activity Level05 ID Desc tppss200.cact + tppss200.desc
Project Activity Level06 tppss200.cact
Project Activity Level06 ID Desc tppss200.cact + tppss200.desc
Project Activity Level07 tppss200.cact
Project Activity Level07 ID Desc tppss200.cact + tppss200.desc
Project Activity Level08 tppss200.cact
Project Activity Level08 ID Desc tppss200.cact + tppss200.desc
Project Activity Level09 tppss200.cact
Project Activity Level09 ID Desc tppss200.cact + tppss200.desc
Project Activity Level10 tppss200.cact
Project Activity Level10 ID Desc tppss200.cact + tppss200.desc
Project Activity Level11 tppss200.cact
Project Activity Level11 ID Desc tppss200.cact + tppss200.desc
Project Activity Level12 tppss200.cact
Project Activity Level12 ID Desc tppss200.cact + tppss200.desc
Project Activity Level13 tppss200.cact
Project Activity Level13 ID Desc tppss200.cact + tppss200.desc
Project Activity Level14 tppss200.cact
Project Activity Level14 ID Desc tppss200.cact + tppss200.desc
Project Activity Level15 tppss200.cact
Project Activity Level15 ID Desc tppss200.cact + tppss200.desc
Project Activity Level16 tppss200.cact
Project Activity Level16 ID Desc tppss200.cact + tppss200.desc
Project Desc tppdm600.dsca
Project Location tppss200.cloc
Quantity tppss200.quan
Reason tppss200.rcod
Reason Desc tcmcs005.dsca
Reference Activity tppss200.rfac
Sales Currency tppss200.sacu
Sales Price tppss200.pris
Scheduled Finish Date tppss200.sfdt
Scheduled Start Date tppss200.ssdt
Scheduled Start Date Is Changed Filter tppss200.sdch
Scheduled Start Date Is Changed Sort tppss200.sdch
Scheduled Start Date is Changed tppss200.sdch
Settlement Currency tppss200.secu
Settlement Price tppss200.prss
Start Percentage tppss200.prst
Time Unit tppss200.cuti
Time Unit Duration tppss200.tmud
To be Settled tppss200.setl
To be Settled Filter tppss200.setl
To be Settled Sort tppss200.setl
Top Activity Flag 1 if top activity, else 0
Total Activity Flag 1 if it is a parent activity, else 0
Total Float tppss200.totf
Total Float in Hours tppss200.tfhr
Unit tppss200.cuni
Unknown 1 for null records, else 0
Work Authorization Status tppss200.wast
Work Authorization Status Filter tppss200.wast
Work Authorization Status Sort tppss200.wast
deleted 1 if deleted in LN, else 0
Customer Defined Fields Standard list of fields