Planned Activities (tsspc2100m100)

Use this session to view and maintain the list of activities planned for the preventive maintenance of an installation group.

Note: 
  • You can view the Required Skills option, only if the Skills implemented checkbox is selected in General Service Parameters (tsmdm0100m000) session.
  • This session can be accessed from the Planned Activity Workbench (tsspc2600m100) session.

Field Information

Planned Activity

The code of the planned activity.

Activity Line

The planned activity line number.

Reference Activity

The code of the reference activity linked to the planned activity.

Description

The description or name of the code.

Planned Start Time

The planned start time for the activity.

Planned Finish Time

The planned finish time for the activity.

Status

The status of the planned activity.

Allowed values

Released
Transferred
Canceled
Free
Installation Group

The code of the installation group.

Description

The description or name of the code.

Item

The code of the item.

Serial Number

The code of the serial number.

Owner

The owner of the item.

Description

The description or name of the code.

Activity Duration

The duration of the planned activity. The value is defaulted from the Reference Activities (tsacm1101m000) session.

Time Duration Unit

The unit in which the activity duration is expressed.

Earliest Start Time

The activity's earliest acceptable start time. The value is defaulted from the Reference Activities (tsacm1101m000) session.

Latest Finish Time

The activity's latest acceptable finish time. The value is defaulted from the Reference Activities (tsacm1101m000) session.

Service Office

The code of the service office.

Description

The description or name of the code.

Operations Department

The code of the operations department.

Maintenance Scenario

The code of the preventive maintenance scenario.

Description

The description or name of the code.

Transferred To

The code of the order to which the planned activity is transferred.

Activity Line Number

The activity line number of the order.

Status

The status of the maintenance sales order.

Service Order Status

The status of the service order.

Allowed values

Planned

When you plan a service order by means of the Service Order Resource Planning (tssoc2260m000) session, the service order status changes from Free to Planned.

Released

Under this status the service engineer carries out the service order. You can change the service order's status to Released when you plan the service order by means of the Service Order Resource Planning (tssoc2260m000) session, or when you choose Release on the appropriate menu in the Service Orders (tssoc2100m000) session.

Completed

The status of service orders that are successfully carried out. To change a service order's status from Released to Completed, choose Complete on the appropriate menu in the Service Orders (tssoc2100m000) session. The service order is then removed from the planning system.

Costed

The status of financially approved service orders. To change a service order's status to Costed (only possible if the status is Released or Completed), choose Cost on the appropriate menu in the Service Orders (tssoc2100m000) session.

Note: Before you change the status to Costed, make sure that all the service order's actual cost lines are entered, and financially approved.
Closed

You can change a service order's status from Costed to Closed by means of the Close Service Orders (tssoc2201m000) session. Service orders with the status Closed cannot have their data changed.

Canceled

You can cancel service orders of status Planned, or Released, by means of the Cancel Service Order (tssoc2204m000) session, but only if all the activities linked to the service orders have the status Planned or Released and have no actual costs booked.

Note: If costs are already invoiced (cost line status is Costed or Posted to Finance), you cannot change the status of the service order and its related activities to Canceled.
Rejected
Free

The status when you first define a service order.

Work Order

The code of the work order.

Status

The status of the work order.

Allowed values

Planned
Released
Completed
Signed-Off
Closed
Canceled
Free
Origin

Indicates the origin of the planned activity.

Allowed values

Manual
Call
Maintenance Plan
Activity Use

The option to define the usage of reference activity.

Allowed values

Field Service

The reference activity can be used only for Field Service usage.

Depot Repair

The reference activity can be used only for Depot Repair usage.

General

The reference activity is not restricted to any particular usage and can be used generally. This activity can be used for Field Service and/or depot repair.

Rental

The reference activity can be used only for Rental usage.

Search Argument

The search argument.

Service Type

The service type.

Description

The description or name of the code.

Coverage Type

The coverage type.

Description

The description or name of the code.

Downtime Ratio

The downtime ratio.

Text
Activity Group

The code of the reference activity group.

Description

The description or name of the code.

Alternate Serial Number

The serial number that the business partner provides to be used an alternative to the item's manufactured serial number.

Note: Alternate serial numbers are specified in the Serialized Items (tscfg2100m000) session.
Top Item

The item code of the highest-level serialized item in the physical-breakdown structure, to which this serialized item belongs.

Note: 
  • The top serialized item is displayed in this field after the item status is set to Active.
  • LN updates the top serialized item is updated when the physical breakdown is modified.
Top Serial Number

The serial number of the topmost serialized item in this item's physical breakdown.

Description

The description or name of the code.

Travel Duration

The time required to travel from the service department to the Installation group's Planned Activity (tsspc2600m000). This value is defaulted from the Installation Groups (tsbsc1100m000) session based on the installation group.

Travel Distance

The distance to be traveled for the planned activity.

Distance Unit

The unit in which the distance in expressed.

Planned Travel Start Time

The planned start date and time of the travel.

Planned Travel Finish Time

The travel finish date and time for the activities in the specified group.

Appointment

If this check box is selected, an appointment has been arranged with the customer for the planned activity to be carried out by the service engineer.

Original Planned Start Time

The original planned time to start the travel.

Original Planned Finish Time

The original planned time to finish the travel.

Reference Point

The reference point to which the address is linked.

Note: The reference point is an arbitrary point on a geographical map identified by GPS coordinates.
Scenario Line

The line number of the maintenance scenario.

Description

The description or name of the code.

Pattern Line

The sequence number that allows multiple pattern lines to be linked to the same scenario line.

Measurement Type

The measurement that is used as a counter to execute the maintenance plan.

Description

The description or name of the code.

Position

The position of the item.

Description

The description or name of the code.

Expected Value

Unit

The unit in which the measurement type is expressed.

Site

The code of the site assigned to the operations department.

Note: 
  • This field is displayed only if the Sites field is set to Active or In Preparation in the Implemented Software Components (tccom0100s000) session.
  • If the planned activity is generated from a maintenance scenario, LN defaults this value from the Preventive Maintenance Scenario (tsspc1630m000) session based on the value the Scenario Use field is set to.
  • If the planned activity is created manually or generated from a call, the site is defaulted based on the value set in the Activity Use field. For more information, see Impact of multisite on preventive maintenance scenarios and planned activities.
Description

The description or name of the code.

Checklist

The checklist code.

Description

The description or name of the code.

Subcontracted

If this check box is selected, the subcontracted item is supplied to the subcontractor's warehouse.

Note: 
  • This field is enabled only if:
    • The Subcontracting with Material Flow field is selected in the Implemented Software Components (tccom0100s000)
    • The Activity Use is set to Depot Repair.
Supply Material to Subcontractor

If this check box is selected, the material linked to a subcontracted activity is supplied to the subcontractor.

Note: 
  • This field is enabled only if:
    • The Subcontracting with Material Flow check box is selected in the Implemented Software Components (tccom0100s000)
    • The Subcontracted check box is selected.
Create Purchase Requisition

If this check box is selected, purchase requisition can be generated as a subcontractor is not identified for the activity.

Subcontractor

The code of the buy-from business partner who performs the subcontracted work required for the activity.

Name

The description or name of the code.

Item Subcontracting

The code of the service item or cost item required to complete the reference activity, if a subcontractor is required.

Note: 
  • The service/cost item is used for a purchase order line. You cannot add an activity to a purchase order line. Therefore, this item is used as an activity definition and is defaulted when generating purchase orders.
  • This field is enabled only if the Subcontracted check box is selected.
  • If the Activity Use field is set to Field Service, you can also specify the Item for which the Item Type is set to Subcontracted Service.
Description

The description or name of the code.