Copy Project Breakdown Structure (tscfg2210m200)

Use this session to create a physical-breakdown structure, from a project-breakdown structure in Project. The project elements are transformed into serialized items.

Note: To use this session, Project must be implemented.

Field Information

Project

The project from which the physical breakdown will be created.

Note: 
  • You can also use free projects. If you do so, be aware that changes made to the project after you have copied the project, are not processed to Service .
  • For the entered project, the value of the Project Package Linked field in the General Projects (tcmcs0552m000) session, must be Project .
Project

The name or description of the project.

Origin Structure

Select the type of project-breakdown structure from which the physical breakdown must be created.

Project Element/Activity

Element Structure and Activity Structures are the types of project. If you select Activity Structure in the Origin Structure field, the code of the activity for the selected project is displayed. If you select Element Structure in the Origin Structure field, the code of the top element for the selected project is displayed here. (Refer to the Element Budget Structure (tpptc1509m000) session).

Project Element/Activity

The description or name of the code.

Installation Group

The code of the installation group to which the newly-created physical breakdown will belong.

Description

The description or name of the code.

Serialized Item Group

The serialized-item group of the newly-created serialized items.

Note: If the Serialized Item Group Usage parameter check box in the Configuration Management Parameters (tscfg0100m000) session is selected, this field must be filled.
Description

The name or description of the serialized item group.

Delivery Time

The delivery time of the newly created serialized item. If you do not specify the value, LN considers the current time as the delivery time.

Installation Time

The date and time when the new serialized item is installed.

Note: This value is defaulted based on the selected top structure.
Copy Materials

If this check box is selected, the material lines associated to the project are also copied. For the material lines to be copied, Material Cost Transactions must be present. If materials are to be considered, it will be checked whether Item - Service data is available and whether the setting Configuration Controlled for the item is Serialized.

Note: The actual serials transferred to the project are not available in the Cost Transactions and therefore cannot be used.
Generate Dummy Serial Numbers

If this check box is selected, dummy serial numbers are generated.

Process Report
Error Report