Rental Resource Lines (tpptc2180m000)

Use this session to view and maintain rental resource lines of a project, linked to a rental template.
Note: The header data of this session is defaulted from the Activity Budget (Equipment) (tpptc2112m000) session and cannot be modified.

Field Information

General
Project
The code of the project.
Plan
The code of the plan.
Activity
The code of the activity.
Equipment Rental
The code of the reference activity that is linked to the rental equipment.
Planned Equipment Request
The code of the planned equipment request generated for the rental activity in a project.
Note: This field is displayed only when the Rental Resource Lines (tpptc2180m000) session is accessed from the Planned Equipment Requests (tppss6125m000).
Budget Details
Quantity
The quantity of the rental equipment.
Note: This field is defaulted with the value of the Equipment Quantity field in the Activity Budget (Equipment) (tpptc2112m000) session.
Cost Amount
The sum of the cost amounts of the rental resource lines.
Note: If the quantity of the rental resource lines is modified, the value of cost amount in the budget is recalculated.
Currency
The currency in which the cost amount is expressed.
Line
The line number of the rental resource line.
Resource Type

The resource type of the reference activity linked to a rental template.

Allowed values

Labor

The overheads are calculated for Labor cost type.

Overhead

The overheads are calculated for Overhead cost type.

Materials

The overheads are calculated for Material cost type.

Equipment

The overheads are calculated for Equipment cost type.

Subcontracting

The overheads are calculated for Subcontracting cost type.

Sundry Costs

The overheads are calculated for Sundry cost type.

Rental Product
If this check box is selected, you can specify a rental product for the rental resource line.
Note: This check box is enabled only if the Resource Type field is set to Equipment.
Resource Item
The rental product specified for the rental resource line.
Note: This field is enabled, if:
  • The Resource Type field is set to Materials.
  • The Resource Type field is set to Equipment and the Rental Product check box is selected.
Description
Resource Cost Object
The cost object specified for the rental resource line. This value is based on the resource type.
Note: This field is enabled if the Resource Type field is set to Labor, Equipment, and Sundry Costs.
Per Unit Quantity
The quantity required for one unit of rental equipment.
Total Quantity
The total quantity of the resource item or cost object.
Total Quantity = Per Unit Quantity x Equipment Quantity
Note: The equipment line quantity of the equipment budget line or estimate line or planned equipment request from where the rental resource lines session is accessed is considered as Equipment Quantity.
Quantity Unit
The unit in which the quantity is expressed.
Note: This field must be specified if the Resource Type is set to:
  • Material
  • Equipment
Amount of Time
The duration for which the resource is used.
Note: The value in this field is defaulted from the Activity Budget (Equipment) (tpptc2112m000) session.
Time Unit
The unit in which the time is expressed.
Note: This field must be specified if the Resource Type is set to:
  • Labor
  • Equipment
Cost Rate
The cost per unit for the cost object.
Cost Amount
The total cost amount for the rental resource line.
Currency
The currency in which the cost amount is expressed.
Cost Component
The cost component at which the cost control is implemented.
Description