Processed Production Bill of Material Line (timfc3660m100)

Use this session to view the details of the processed production bill of material (PBOM) line that is received from Product Lifecycle Management (PLM).

Note: This session can be accessed only if:
  • The Engineering Revisions check box is selected in the Implemented Software Components (tccom0100s000) session.
  • The Job Shop by Site field is set to Active in the Implemented Software Components (tccom0100s000) session.
  • The Originating App field is set to PLM (Internal) or PLM (external) in the Item Base Data Parameters (tcibd9199m000) session.

Tabs

The lines on the tabs refer to these sessions:
  • Alternative Materials

    Refers to the Processed Production BOM - Alternative Materials (timfc3161m100) session. On this tab, you can view all the received alternative material lines of the processed production bill of material line received from PLM.

  • Reference Designators

    Refers to the Processed Production BOM - Reference Designators (timfc3162m100) session. On this tab, you can view all the reference designators of the processed production bill of material line received from PLM.

Field Information

Product
The code of the product associated with the processed production bill of material that is received from PLM.
Position
The position number of the material line associated with the received production bill of material.
Item
The code of the item for which the production bill of material is generated.
Source Revision
The revision of the production BOM from which the bill of material revision is generated.
Status
The status of the processed production bill of material.

Allowed values

New
Approved
Expired
Quantities
Net Quantity
The net quantity of the processed production bill of material line that is received from PLM.
The unit in which the net quantity of the production bill of material is expressed.
Net Quantity in BOM Unit
The net quantity of the processed production bill of material line received from PLM that is expressed in BOM Unit.
BOM Unit
The BOM unit in which the net quantity of the processed production bill of material is expressed.
Scrap Percentage
The scrap material that can be defined as a percentage of the net material requirements in the production bill of material (BOM). This is also considered as the scrap factor, and as a fixed quantity, which is the scrap quantity.
Scrap Quantity
The expected quantity of the material that is lost every time during the production, for example, to test the equipment. You can define scrap as a percentage of the net material requirements, which is the scrap percentage, and as a fixed quantity, which is the scrap quantity.
Scrap Quantity in BOM Unit
The scrap quantity of the processed production bill of material expressed in the BOM unit.
Size Unit
The unit of measurement for Length and Width.
Length
The value that is used to calculate the net quantity if the inventory unit is Length or area unit. In case of area unit, this field is used in combination with Width.

The Length, Width, Size Unit and Number of Units fields apply only if the material has length or an area inventory unit, such as meter and square meter. The inventory unit is defined in the Items (tcibd0501m000) session.

Width
The value that is used to calculate the net quantity if the inventory unit is Width or area unit. In case of area unit, this field is used in combination with Length.

The Length, Width, Size Unit and Number of Units fields apply only if the material has length or an area inventory unit, such as meter and square meter. The inventory unit is defined in the Items (tcibd0501m000) session.

Number of Units
The number of times that the required quantity of the material, specified in the Length field and/or the Width field, displays in the product.
Use Up
Replaces Item
The material from the previous bill of material revision, which is now a use-up material. If the use-up material exists in inventory, this item is used instead of the material specified in the Item field.
Miscellaneous
Percentage Required
The percentage of the material that must be available before the operation can be started.
Note: This field is applicable only if the Infor SCM Scheduler check box is selected in the Production Order Parameters (tisfc0100s000) session.
Allow Multiple Items
If this check box is selected, LN can distribute the net quantity of the material over multiple alternative materials. For example, the net quantity can be divided over the use-up material and the standard material or over the standard material and one or more alternative materials.

If this check box is cleared, LN issues only a single item for this BOM line for one production order.

Note: This field is applicable only if the Alternative Materials and/or the Use Up Material check box is selected in the Implemented Software Components (tccom0100s000) session.
Standard Configuration
If this check box is selected, the processed production bill of material line is part of the standard configuration of the product.
Note: This field is applicable only if the Unit Effectivity check box is selected in the Implemented Software Components (tccom0100s000) session. You can also use this field to determine whether the material must have this demand peg as well.
Inherit Demand Peg
If this check box is selected, the demand peg exists for the material if the demand peg exists for the production order.
Note: This field is applicable only if the Demand Pegging check box is selected in the Implemented Software Components (tccom0100s000) session.
Phantom
If this check box is selected, the material or component of the received production bill of material is a phantom.
Text