Received Production Bills of Material (timfc3150m000)

Use this session to to view the production bill of material data that is received from Product Lifecycle Management (PLM).

The data in this session is populated when a production bill of material is processed in PLM. You can only receive the production bill of material data that includes the fields based on the template defined in the Production Bill of Material Control (timfc3199m000) session. This indicates that all the fields that are controlled by PLM must be set.

Note: This session can be accessed only if:
  • The Engineering Revisions check box is selected in the Implemented Software Components (tccom0100s000) session.
  • The Job Shop by Site field is set to Active in the Implemented Software Components (tccom0100s000) session.
  • The Originating App field is set to PLM (Internal) or PLM (external) in the Item Base Data Parameters (tcibd9199m000) session.

Field Information

Product

The code of the product associated with the production bill of material.

Source Revision

The revision of the production bill of material (BOM) in PLM.

Revision Status

The revision status of the source from where the production bills of material is received.

Allowed values

Received
Processed
Rejected
Received On

The date and time when the production bills of material is received from PLM.

Received By
The logon code of the user who receives the production bills of material from PLM.
Processed On

The date and time when the production bills of material received from PLM is processed.

Processed By

The logon code of the user who processes the production bills of material from PLM.

Rejected On

The date and time when the production bills of material received from PLM is rejected.

Rejected By

The logon code of the user who rejected the production bills of material from PLM.