Print Operation Analysis (tiasc5401m000)

Use this session to to print operation anaysis.

Field Information

Sort by

Select in which order the data is sorted:

Allowed values

  • Line Stations by Assembly Order
  • Assembly Orders by Line Station
Assembly Order

assembly order

Line Station

line station

Start Date
The range of dates that determine the period for which the analysis is performed. For the calculation of the workload, only line station orders (LSOs) whose start date falls in this range are considered.