Setting up Integrations in Controlling

To set up data for integrations in the Controlling, perform these steps:

  1. Create the source and destination integration and the dimension type in the Integration Scheme for Standard Cost Calculation (tffbs1530m000) session..
  2. Define cost components in the Defaults for Standard Cost Calculation (tffbs1531m000) session based on which the operation rates and surcharges must be stored in Operations Management.
  3. Import the logistic performance data using the Reference Units per Dimension (tffbs0530m000) session.
  4. Create a link between the Hours Accounting and the dimension or reference unit in the Integration Scheme for Hours (tfcat2521m000) session.
  5. Specify the required data in the Cost Accounting Parameters (tfcat0100s000) session.
  6. Specify the Cost Portion and Credit Account Source for the source dimension in relation to the destination dimension to calculate the variances, using the Integration Scheme for Variances (tfcat0104s000) session.