Data set up for Use-up material

These settings are required to enable the use-up material feature.

You must ensure:

  • The Replaces Item check box is selected in the Job Shop Bill of Material Control (tibom5100m000) session.
  • The Use-Up Item check box is selected in the Production Bill of Material Control (timfc3199m000) session.
  • Production BOM Lines must be set to Active in the Integration Mapping Objects (pderp0106m000) session.
  • Job Shop BOM Lines must be set to Active in the Integration Mapping Objects (pderp0106m000) session.
  • Enable Create and Enable Update check boxes are selected for the Use up item in the Integration Mapping Objects (MMT) (pderp0606m000) session.
  • The Use-Up Materials check box is selected in the All Users PLM Preferences (pdadm0102m300) session.