Combined Freight Orders (fmlbd1520m000)

Use this session to view the combined freight orders from which a load plan is created. A combined freight order consists of a number of freight order lines that share the same attributes.

On the appropriate menu menu, you can access the Combined Freight Order Lines (fmlbd1521m000) session to view the freight order lines of the selected combined freight order.

Field Information

Plan

The load plan for which the combined freight order is created.

Combined Freight Order

A combined freight order on which the load plan is based. A load plan can be based on one or more combined freight orders.

  • The load building process
Ship-from Address

The code of the address where the goods are loaded and shipped to their destination.

Ship-to Address

The code of the destination address of the goods listed on the freight order. This is the address where the goods are unloaded.

Planned Load Date

The planned date and time on which loading is to take place at the ship-from location.

Earliest Load Date

The earliest date and time that loading can take place at the ship-from location.

The default earliest and latest loading and unloading date/times tolerances are defined in the Addresses - Freight Management (fmfmd0110m000) session and the Freight Order Control Parameters (fmfoc0100m000) session.

Latest Load Date

The latest date and time that loading can take place at the ship-from location.

The default earliest and latest loading and unloading date/times tolerances are defined in the Addresses - Freight Management (fmfmd0110m000) session and the Freight Order Control Parameters (fmfoc0100m000) session.

Planned Unload Date

The planned date and time on which unloading is to take place at the ship-to location.

Earliest Unload Date

The earliest date and time that unloading can take place at the ship-to location.

The default earliest and latest loading and unloading date/times tolerances are defined in the Addresses - Freight Management (fmfmd0110m000) session and the Freight Order Control Parameters (fmfoc0100m000) session.

Latest Unload Date

The latest date and time that unloading can take place at the ship-to location.

The default earliest and latest loading and unloading date/times tolerances are defined in the Addresses - Freight Management (fmfmd0110m000) session and the Freight Order Control Parameters (fmfoc0100m000) session.

Single Shipment Order

If this check box is selected, the current freight order or freight order line is planned as a single shipment, regardless of the planning algorithm selected in the Generate Plan (fmlbd0280m000) session. The lines of a single shipment freight order are placed in one shipment, provided that the combination codes and transport types match.

Single Shipment Order Line

If this check box is selected, the current freight order or freight order line is planned as a single shipment, regardless of the planning algorithm selected in the Generate Plan (fmlbd0280m000) session. A single shipment freight order line is placed in one shipment.

Carrier/LSP

carrier

Carrier/LSP Binding

If this check box is selected, the carrier selected in this field cannot be overruled by the load building engine of Freight .

Transport Means Combination

transport means combination

Transport Means Group

transport means group

Means of Transport

means of transport

Combination Code

combination code

Transport Type

transport type

Route

route

Route Plan

route plan

Standard Route

standard route

Delivery Terms Transport Category

The transport category of the delivery terms.

Allowed values

Water

Transport by sea or inland waterway.

Not Applicable

Any transport category can be used.

Point of Title Passage

The point of title passage that apply to the combined freight order.

Piece Unit

The loading unit for the item. The quantity expressed for the loading unit indicates the number of items that is held by or contained in the loading unit.

Status

The shipment status.

To be Replanned

If this check box is selected, the combined order with all order lines must be replanned. This is a technical field used by LN during the load building process.

Ship-from Address

The ship-from address, where the goods are loaded.

Ship-to Address

The destination address of the goods that must be transported.

Ship-from Address

The city of the ship-from address.

Ship-to Address

The destination city of the goods that must be transported.