cpwlc domains

Production Volume

The plan items with the highest production volume are planned first. The production volume is the quantity to be produced in a plan period.

Volume Moved

The plan items with the highest volume to be moved are planned first. The volume moved is the production volume that has been moved to the plan period under consideration.

Number of Periods Moved

The plan items for which the production volumes have been moved. LN plans the highest number of plan periods first.

Volume and Periods Moved

For each plan item the volume moved and the number of periods moved are multiplied. The plan items for which this multiplication gives the highest values, are planned first.

Infinite Plan

An infinite plan is generated as input for the rest of the simulation.

Current Master Plan

The current master plan, generated in the Generate Master Planning (cprmp1202m000) session, is the input for the workload control engine for the levelling of the workload over the plan periods. LN will leave the purchase plan and the planned distribution orders unchanged.

Note: 

If you select Current Master Plan, you will probably need less iterations to reach an optimum situation. This is especially true, when only small changes have been made to the master plan.

In this way, you can enter a lower value in the Number of Iterations field in the Generate Master Planning (cprmp1202m000) session, and achieve a faster simulation.