Order Planning Statistics (cprrp8100m000)

Use this session to view statistics per order planning run.

Field Information

Run number

The identification number of the planning run.

Scenario

scenario

Session

The session from which Enterprise Planning retrieves the order planning.

User

The name of the user responsible for planning.

Job

The job ID.

Job sequence number

The sequence number of the planned item.

Number of Items

The total number of items planned.

Start Date

The start date of the run.

End Date

The end date of the run.

Run Time (hh:mm:ss)

The time it took for the planning run to be completed in hours, minutes and seconds.

Average Rate (items/sec)

The average planning rate in items per second for the selected run.

Number of parallel bshells

The number of servers (bshells) that calculate and actualize planning data.

Note: Number is always zero (0) if parallel processing is not active.
Stopped

If this check box is selected, the planning run was aborted before completion.

Loop detected

If this check box is selected, a loop was detected in the bill of material (BOM) structure of the item being planned.

Failure Messages

The number of failure messages generated during the planning run.