Validate Job Shop Planning Bill of Material (cprpd3246m000)

Use this session to validate the Job Shop Planning Bills of Material. This session checks whether the material lines are defined, and loops are detected. The application displays a warning message if the planning percentage or planning quantity for a position and sequence number is zero or when the planning percentages of all lines of the same position is not 100 percent.

Note: 
  • This session can be accessed only if the Configurations by Site field is set to Active or Enterprise Model in Preparation in the Implemented Software Components (tccom0100s000) session.
  • You can use the Validate button to validate the specified range of job shop planning bill of material data.

Field Information

Selection Range
Use the fields in the selection range group box to validate the Job Shop Planning Bills of Material.