Print Critical Capacity Requirements (cprmp2440m000)
Use this session to print a report of the critical capacity requirements that originate from a specific plan item or from a range of plan items.
LN prints a report with details about critical capacity requirements as LN displays them in the Critical Capacity Requirements (cprmp3560m000) session.
To print a report of critical capacity requirements:
-
Select a range of:
- Scenarios
- Plan periods in which the work center capacity is required
- Work centers
- Originating plan periods (in which the planned supply falls)
- Plan items
- Click .
- Select a report type from the Select Report list box and click OK.
You can select the following two report types:
- Critical Capacity Requirement by Plan Item: LN prints a report that lists the critical work centers of which capacity is required for a particular plan item.
- Critical Capacity Requirement by work center: LN prints a report that lists the items for which capacity of a particular work center forms a critical capacity requirement.
Field Information
- Scenario
-
Specify the first of a range of scenarios for which LN must print reports with details about critical capacity requirements.
- Scenario
-
Specify the last of a range of scenarios for which LN must print reports with details about critical capacity requirements.
- From Plan Item
-
Specify the first of a range plan items for which LN must print a report about the critical capacity requirements.
- To Plan Item
-
Specify the last of a range plan items for which LN must print a report about the critical capacity requirements.
- Period Required
-
Specify the first of a range of plan periods in which the critical capacity requirements that LN includes in the report, must occur.
- -
-
Specify the last of a range of plan periods in which the critical capacity requirements that LN includes in the report, must occur.
- Sort By
-
Specify which report you want to print.
Allowed values
- Plan Item
- Work Center