Print Critical Capacity Requirements (cprmp2440m000)

Use this session to print a report of the critical capacity requirements that originate from a specific plan item or from a range of plan items.

LN prints a report with details about critical capacity requirements as LN displays them in the Critical Capacity Requirements (cprmp3560m000) session.

To print a report of critical capacity requirements:

  1. Select a range of:

    • Scenarios
    • Plan periods in which the work center capacity is required
    • Work centers
    • Originating plan periods (in which the planned supply falls)
    • Plan items
  2. Click Print.
  3. Select a report type from the Select Report list box and click OK.

You can select the following two report types:

  • Critical Capacity Requirement by Plan Item: LN prints a report that lists the critical work centers of which capacity is required for a particular plan item.
  • Critical Capacity Requirement by work center: LN prints a report that lists the items for which capacity of a particular work center forms a critical capacity requirement.

Field Information

Scenario

Specify the first of a range of scenarios for which LN must print reports with details about critical capacity requirements.

Scenario

Specify the last of a range of scenarios for which LN must print reports with details about critical capacity requirements.

From Plan Item

Specify the first of a range plan items for which LN must print a report about the critical capacity requirements.

To Plan Item

Specify the last of a range plan items for which LN must print a report about the critical capacity requirements.

Period Required

Specify the first of a range of plan periods in which the critical capacity requirements that LN includes in the report, must occur.

-

Specify the last of a range of plan periods in which the critical capacity requirements that LN includes in the report, must occur.

Sort By

Specify which report you want to print.

Allowed values

  • Plan Item
  • Work Center