Close Physical Breakdown Changes (tscfg2240m100)
Use this session to close one or more physical breakdown changes. You can close the selected records or define a range of records to be processed.
Note:
- You can also access this session by selecting the Close Changes option from the Actions menu in the Physical Breakdown Changes (tscfg2140m000) session.
- This field is displayed only if the Physical Breakdown Changes check box is selected in the Configuration Management Parameters (tscfg0100m000) session.
Field Information
- Selection Range
- Use the fields in the Selection Range group box to specify the range of physical breakdown changes that must be closed.
- Settings
-
- Simulate
- If this check box is selected,the application runs the close physical breakdown process in simulation mode. The process does not save the results but generates a report of the expected outcome.
- Reports
-
- Process Report
- If this check box is selected, the application generates a report after the close physical breakdown changes process completed successfully. The report lists all the physical breakdown changes that are closed.
- Error Report
- If this check box is selected, the application generates a report with the list of errors when the close physical breakdown changes process is not completed successfully.