Create Item Breakdown from Standard Production BOM (tscfg1210m200)

Use this session to create an item breakdown from a standard production bill of material (P-BOM).

You can link the item breakdown to an Installation in the Installations (tsbsc1110m000) session as a so-called anonymous item.

Note: 
  • Only P-BOM items listed in the Items - Service (tsmdm2100m000) session, and/or the Item Service Defaults (tsmdm2105m000) session, will be copied to the newly created item breakdown.
  • The project segment of the item cannot be used in this session.
  • If you create an item breakdown for manufactured items with a BOM quantity greater than one (1), a decimal quantity of item-breakdown components can result.

Field Information

Production BOM

The item from which you want to copy the product structure to an item breakdown.

Note: The project segment of the item cannot be used in this session.
Description

The description of the P-BOM item.

Check Effectivity

If this check box is selected, LN only copies the items of the P-BOM that are valid on the date you enter in the Expiry Date field.

Note: The P-BOM items that expire after the entered date are also copied.

If this check box is cleared, LN copies all items of the P-BOM.

Effective On

LN only copies the items of the P-BOM that are valid on this date/time.

Note: 
  • The P-BOM items that expire after the entered date are also copied.
  • Clear the Check Effectivity check box to copy all the P-BOM items.
Copy Alternative Material

Select the checkbox to copy the alternative items along with the item breakdown details from the production BOM.

Create Item Breakdown for Related Rental Product
If this check box is selected, an item breakdown is created for the Rental Product based on the Production BOM item. The Item breakdowns are displayed in the Item Breakdowns (tscfg1110m000) session. When the check box is cleared, an Item Breakdown for the Production BOM item is created.
Note: 
  • This check box is enabled only if the selected Production BOM item is serialized, and a related serialized rental product is specified.
  • This check box is selected and disabled when the selected Production BOM Item is not serialized but the serialized Related Rental Product is specified for an item in theItem (tcibd0501m100) session.
  • When the Production BOM item is non-serialized and a serialized Related Rental Product does not exist, the application displays the no Item Breakdown can be created for a non-serialized item error message.