plaps domains
- Infor Planner
- If this option is selected, Planner+ is enabled in Infor LN. The application uses the native Planner+ engine for advanced planning, scheduling, and scenario management.
- External Planner
- If this option is selected, Planner+ is disabled in Infor LN. The organization can integrate an external planning solution with Infor LN.
- Yes
- No
- AWS S3
- App Data
- Temporary
- Temporary allocation of items that can be changed if required.
- Firm
- Permanent allocation of items to a demand transaction. These items cannot be used for other transactions.
- User
- MRP_DRP
- ATP
- CTP
- Planning
- DOA
- Phantom
- None
- Forecast Consumption
- Supplier
- A buy-from business partner.
- Customer
- A sell-to business partner.
- Buy From
- Ship From
- Buy From Ship From
- None
- Sell To
- Ship To
- Sell To Ship To
- None
- Planned
- Due
- Committed Date
- Requested Date
- Days
- Weeks
- Months
- Years
- Minimum Quantity Inventory Plan
- The target inventory is determined based on the minimum quantity required in the inventory.
- Safety Stock Inventory Plan
- The target inventory is determined based on the safety stock available.
- Demand Coverage Inventory Plan
- The target inventory is determined based on the demand coverage.
- Production
- Shipment
- Reception
- Transportation
- Rated
- The duration of the operation is variable.
- Fixed
- The duration of the operation is fixed.
- Standard
- Specialized
- Year
- Quarter
- Month
- Week
- Day
- Hour
- Minute
- Second
- Millisecond
- Invalid
- Infinite
- The resource utilization is based on the workload requirement.
- Finite
- The resource utilization is based on the overload threshold.
- Infinite
- Finite
- SO
- SO Step
- Consumption
- The items that are consumed in the sourcing process.
- Production
- The items that are produced in the sourcing process.
- Phantom
- The items that are not in stock or supplied.
- Standard
- Specialized
- Manual
- Calendar
- Fixed
- Daily
- Weekly
- Biweekly
- Monthly
- Monday
- Tuesday
- Wednesday
- Thursday
- Friday
- Saturday
- Sunday
- Item Family
- SKU Item
- Initial
- Running
- Completed
- Failed
- Maximum Lateness
- Average Lateness
- Resource Utilization
- Ignore
- The value of the safety stock is not considered.
- Enforce
- The value of the safety stock is used as the minimum value, even if the value of the inventory plan is smaller.
- Add To Inventory Plan
- The value of the safety stock is added to the value of the inventory plan.
- Default
- The usual sourcing process defined for the item.
- Maximum Weight
- The sourcing process with the highest specified weight.
- Balance Load
- The specified sourcing processes, in proportion with the weight.
- Maximum ATP
- The sourcing process of the site with the maximum Available To Produce (ATP).
- Minimum Cost
- The the sourcing process incurring the least cost.
- Minimum Supply Time
- The the sourcing process with the lowest lead time.
- Minimum Transportation Cost ATP
- The sourcing process of the site with the minimum transportation cost to fulfil ATP requirements.
- None
- Temporary
- Firm
- Firm Except Forecast
- REQ
- Requirements Engine
- PE
- Planning Engine
- CTP
- Capable to Promise
- CDP
- Can-Do Planning Engine
- Committed date
- Requested date
- Based on due date of SO
- Based on due start date of SO Step
- Always
- The safety time on the purchasing process is always considered.
- Changed Delivery Dates Not Set
- The safety time on the purchasing process is considered only if the Changed Delivery Date field on the Supply Order (plaps3601m000) session is not specified.
- Confirmed & Changed Deliv Dates Not Set
- The safety time on the purchasing process is considered only if the Changed Delivery Date and Confirmed Delivery Date fields on the Supply Order (plaps3601m000) session are not specified.
- None
- Temporary
- Firm
- Firm except for forecasts
- Ignore Safety Stock
- The value of the safety stock is not considered.
- Enforce Safety Stock
- The value of the safety stock is used as the minimum value, even if the value of the inventory plan is smaller.
- Add to Inventory plan
-
The value of the safety stock is added to the value of the inventory plan.
Note: This value can be changed for any specific item.
- Default
- Maximum Weight
- Balance Load
- Maximum ATP
- Minimum Cost
- Minimum Supply Time
- ATP with Minimum Transportation Cost
- Due Date
- Recommended Date
- Material
- A planning or scheduling constraint due to material unavailability.
- Capacity
- A planning or scheduling constraint due to resource unavailability.
- Time
- A planning or scheduling constraint due to the delay of an order.
- Multiple
- Multiple constraints are applicable.
- None
- None of the constraints are applicable.
- Absolute
- Relative
- Split
- Expedite And Split
- The type of split used for a supply order that requires the earliest shipping date which is earlier than the due date.
- Postpone And Split
- The type of split used for a supply order that requires a due date which is later than the current due date.
- Decrease
- The type of split used for a supply order with surplus quantity.
- Coproduct
- Planning Plan Item Group
- Buyer
- Planner
- Production Resource
- Transport Resource
- Storage Resource
- Within Planning Horizon
-
Availability of Items is limited from the start date to the end date of the planning horizon.
Note:
- This field is displayed only if the Planner Type field is set to Infor Planner.
- If an item is not a constraint, the planning engine can schedule an order early or late.
- Never
- Within Time Fence
- Availability of items is limited within the period defined by the time fence.
- Finite
- Infinite
- Demand Orders
- Supply Orders
- All Sites
- Selected Sites
- Selected Site Groups
- Undefined
- Family
- Generic
- Standard
- Customized STO
- Customized ETO
- SIC
- MRP
- MPS
- Family
- SKU
- Project SKU
- Job Shop
- Subcontracting
- Purchase
- Distribution
- Based On Max Level
- Based On Bucket Type
- Based On Demand
- Manufacturing
- Subcontracting
- Purchasing
- Distribution
- No
- ATP
- CTP
- For capacity
- For Capacity inside FTF; always outside
- Always
- Frozen
- Frozen inside FTF; always outside
- Frozen inside FTF; for capacity outside
- MT_AlwaysNoExpediteCompress
- Never
- The planning engine sets the planned delivery date to the due delivery date.
- No Confirmed Date
- A released purchase order moves only when the confirmed delivery date is not specified. The Due end date must be within NOW + Supply time + Safety time.
- No Confirmed or Changed Date
- A released purchase order moves only when the Confirmed Delivery Date or Changed Delivery Date is not specified. The Due end date must be within NOW + Supply time + Safety time.
- No Constraint
- The material constraints are not generated.
- Finite Plan
-
The material constraints are identified in the finite plan by evaluating material demand by due date.
A material constraint is generated when finite-plan supply does not meet material demand on the due date.
Material demands are evaluated sequentially by planned date by using forward scanning in the finite plan.
With this method, material constraints are generated only for purchased items.
Subassemblies are not identified as material constraints.
A material constraint is generated when the producing manufacturing order step is released or confirmed and cannot be moved.
- Infinite Plan
-
The material constraints are generated when demand is not satisfied on the requested due date. Generated constraints include a used date and an available date.
Constraints generated by the Infinite plan method are not related to the finite plan. Late orders exist in the finite plan without associated constraints when this method is used.
The Finite plan method is recommended for material constraint generation.
- No Constraint
- The capacity constraints are not generated.
- Finite Plan
-
The capacity constraints are generated for manufacturing order steps based on the finite plan.
The capacity demand for a manufacturing order step is evaluated at the due start date to identify capacity constraints. When sufficient capacity is not available, the resource is considered available at the planned completion date of the step.
Manufacturing order steps are evaluated in the finite plan sequence, based on planned start dates.
- Infinite Plan Due
-
The capacity constraints are generated for manufacturing order steps based on the infinite plan generated by the Requirements Engine.
The capacity demand is evaluated at the due start date, and manufacturing order steps are sequenced by due start date. The capacity constraint analysis and resolution use the same sequencing logic as constraint generation, based on due start date.
- Infinite Plan Planned
-
The capacity constraints are generated for manufacturing order steps based on the infinite plan generated by the Requirements Engine.
The Capacity demand is evaluated at the due start date, and manufacturing order steps are sequenced by planned start date. The capacity constraint analysis and resolution use the same sequencing logic as constraint generation, based on planned start date.
- Warehouse Supply Order
- Purchase Order
- Distribution Order
- Manufacturing Order
- Substitution Order
- PRP Purchase Order
- PRP Warehouse Order
- Project
- No Propagation
- Propagation Add and Changes
- Propagate Changes
- Maximum
- Very High
- High
- Medium High
- Medium
- Medium Low
- Low
- Very Low
- Minimum
- Planned
- Firm Planned
- Confirmed
- Released
- Supply Order Transaction
- SO Step Supply Transaction
- To Produce
- To Consume
- To Receive PO
- To Receive DO
- To Ship CO
- To Ship DO
- To Ship Forecast
- On Hand Quantity
- To Increase
- To Decrease
- To Increase Inventory Plan
- To Decrease Inventory Plan
- To Increase Substitution
- To Decrease Substitution
- Distribution
- Manufacturing
- Purchasing
- Do Nothing
- Recalculate Date
- Recalculate Quantity
- Regenerate
- Warehouse Demand Order
- Customer Order Line
- Forecast
- Sales Quotations
- Sales Schedules
- Sales Contract
- Planned Service
- Maintenance Service Order
- Maintenance Work Order
- PRP Purchase Order
- PRP Warehouse Order
- Project
- Project Contract
- Production Schedule
- Forecast
- Channel
- Forecast Channel
- None
- Not Applicable
- Independent Demand
- Dependent Demand
- SO Step Demand Transaction
- Demand Order Transaction
- SO New RCM
- Substitution Supply RCM
- Skip Supply RCM
- Use Target Inventory RCM
- Postpone RCM
- Expedite RCM
- Decrease RCM
- Cancel RCM
- Split RCM
- New
- Automatically Accepted
- Accepted
- Rejected
- Postpone
- Expedite
- Decrease
- Cancel
- SO New
- Substitution Supply
- Use Target Inventory RCM
- Skip Supply
- Receiving Step
- BOM Step
- Operation Step
- Shipping Step
- Transportation
- To Produce
- In Process
- Fully Constrained
- Partially Constrained
- Fully Unconstrained (Due Date)
- Fully Unconstrained (Rec. Date)
- No Debug
- The debugging is disabled.
- Quick Debug
- The option is used to test or verify a small change without a full debugging process.
- Full Debug
- This option is used for comprehensive debugging of the entire application, especially for complex issues or production-level troubleshooting.