Close Production Schedules (tirpt4201m000)

Use this session to close a range of production schedule (lines).

Note: This session validates the status of material lines in the selected production order lines for the production schedule.

Field Information

Site

The site ID.

Note: Only visible if multisite functionality is active.

Multisite overview

Production Schedule

The ID of the schedule.

Note: The value is defaulted from the Production Schedules (tirpt4101m000) session.
Schedule Position

The ID of the production schedule line.

Note: The value is defaulted from the Production Schedule Lines (tirpt4102m000) session.
Schedule Lines Only

the open material lines for the selected range of production schedule lines are closed.